Edenville Energy secures washing plant and crusher to start coal production

By

Sharecast News | 23 Feb, 2017

Edenville Energy has secured a coal washing plant and crusher in order to start coal production at its Rukwa project in Tanzania.

The AIM-listed company hopes to complete the purchase of the wash plant and coal crusher soon after its shareholder meeting on 17 March 2017.

The wash plant is based on a dense medium separation system which will enable several different product specifications to be produced to allow flexibility in providing bespoke products.

Edenville has also appointed a plant engineer for shipment of the equipment and construction at the project.

Chief executive Rufus Short said: "The wash plant is an integral part of the process to maximise the Rukwa coal deposit's potential and we are confident we have selected a suitable system.

"We believe our coal wash plant will be the only such facility operating commercially in Tanzania and will place us in a strong position. We have significant interest in our coal from several different parties and the wash plant will enable the operation to deliver a consistent specified product to the local and regional market."

Shares in Edenville Energy were up 0.41% to 0.854p at 0949 GMT.

Last news