Sound Energy starts second well at Tendrara

By

Sharecast News | 26 Aug, 2016

Sound Energy has begun a three-phase drill programme of a second well at Tendrara, onshore Morocco.

This followed the success of well TE-6. The latest well, TE-7, was spudded on 25 August.

"The well objectives of TE-7 include proving sufficient gas volumes and well deliverability to enable finalisation of the field development plan and a concession application and demonstrating the benefits of sub-horizontal drilling, which is expected to be implemented as the production well concept for Tendrara," Sound Energy said.

Drilling was planned to reach a total measured depth of 3440 meters.

Last news