Prospex Oil and Gas begins spudding at Romanian based Bainet-1 Well
Prospex Oil and Gas confirmed on Monday that the Bainet-1 Well at the EIV-1 Suceava Concession, onshore Romania, in which the company has a 50% interest, spudded at approximately 3.30pm on 10 November 2017.
FTSE AIM All-Share
728.67
15:45 15/11/24
n/a
n/a
Mining
10,633.77
15:45 15/11/24
1.51%
158.40
Prospex Energy
7.05p
15:24 15/11/24
-0.70%
-0.05p
The investment company said the Well was targeting the Bainet Prospect, which lies on trend with like fields producing from good quality Salmatian reservoirs on the concession besides analogue gas fields which produce conventional high-calorific value natural gas from the nearby Bilca gas production area.
Drilling at Bainet was expected to take 15 days.